Discover how Artts Construction turns your vision into reality with a seamless work process. From design to installation, we ensure quality and satisfaction every step of the way.
Steps of Our Work – Artts Construction’s Seamless Process
Explore the steps of our work process at Artts Construction. From initial consultation to project completion, we ensure top-quality craftsmanship and customer satisfaction.
1
Request a Free Estimate
Submit your request for a free project estimate by providing details about your needs. We promptly review your inquiry and contact you for clarification.
2
Measurement and Cost Estimation
Our specialist visits your site to take precise measurements and prepares a detailed cost estimate tailored to your project requirements.
3
Contract Signing and Initial Deposit
Once all project details are agreed upon, we sign the contract. You provide a 30% deposit, enabling us to purchase materials, begin engineering, and secure permits.
4
Engineering Plan and Material Selection
Our engineers create a detailed project plan. We source and acquire high-quality materials tailored for your specific needs.
5
Permit Approval from Florida County
We handle the process of obtaining all necessary permits from your local county in Florida, ensuring full compliance with regulations.
6
Quality Installation and Final Payment
Our skilled professionals perform the installation according to the engineered plan. Once the project is completed, the remaining 70% payment is collected.
Daily Progress Reports – Transparent Updates on Your Project
Stay informed with daily progress reports detailing work completed, materials used, and milestones achieved. Each step is accompanied by attached photos and videos for full transparency.
Daily Work Report – Day 1
Daily Work Report – Day 1
All necessary materials were successfully delivered to the site as planned;
The project officially began today with a focus on preparation and initial setup;
The site was marked and prepared according to the engineering plan to ensure accuracy and compliance;
Installation of the aluminum framework commenced;
Initial assembly steps were completed, setting the foundation for the project’s structure.
Daily Work Report – Day 2
Daily Work Report – Day 2
Framework Installation. Continued installation of the aluminum framework in strict accordance with the engineering plan;
Ensured all measurements and alignments met specified standards;
Anchor Installation. Successfully installed anchor footings for the support columns, providing a strong and stable foundation for the structure;
Installed rafters as part of the preparation for the future roof assembly;
Ensured proper spacing and alignment to maintain structural integrity.
Daily Work Report – Day 3
Daily Work Report – Day 3
Screen Installation. Installed a high-quality screen for the Lanai, made in the USA;
The screen is durable and features a fine mesh to effectively block small flies and mosquitoes, ensuring a comfortable outdoor experience;
Coil and Kick Plate Installation. Successfully installed the coil and kick plate to enhance the structure’s durability and functionality;
These components were precisely fitted to meet design specifications and provide additional structural integrity;
Roof Panel Installation. Installed durable aluminum roof panels to provide long-lasting protection and style;
Ensured proper alignment and secure fastening for structural stability and weather resistance.
Daily Work Report – Day 4
Daily Work Report – Day 4
Screen Door and Closure Kit Installation. Installed a durable screen door with a high-quality closure kit to ensure smooth operation and secure functionality;
Adjusted and tested the door for proper alignment and seamless use;
Gutter System Installation.Installed gutters, downspouts, and elbow components to effectively manage water drainage and protect the structure from potential water damage;
Ensured all components were securely attached and aligned for optimal performance.
Daily Work Report – Day 5
Daily Work Report – Day 5
Fascia and Valance Installation. Installed fascia and valance to enhance the structure’s aesthetic and protect the roofline;
Ensured precise fitting and alignment to maintain durability and a clean, polished appearance;
Gutter System Inspection. Conducted a thorough quality check of the previously installed gutters, downspouts, and elbows;
Verified proper alignment, secure attachments, and effective water flow for optimal performance;
Quality Assurance. Performed a detailed inspection of all work completed today to ensure it meets high-quality standards and project specifications.
Order Services from Artts Construction
Live Streaming from Your Project Site – Stay Connected in Real-Time
New for our clients: Enjoy real-time live streaming from your project site in Florida. Perfect for out-of-state property owners. Free and optional service for full control and transparency.
Request Live Streaming from Your Project Site – Stay Updated
Follow Us on Social Media – Daily Updates and Projects. Stay connected with us on social media! Follow our daily updates, see our latest projects, and track our progress. Join us to stay informed and inspired.